D6-B full-scenario controlled-response system

D6-B

D6-B full-scenario controlled-response system

A compact response node designed to coordinate with detection and positioning systems for authorized, operator-led action in the field.

Discuss this system

Product introduction

A compact response node designed to coordinate with detection and positioning systems for authorized, operator-led action in the field.

Core capabilities

A compact response node designed to coordinate with detection and positioning systems for authorized, operator-led action in the field.

01

Authorized, operator-controlled spectrum response

Supports operator-controlled action across the configured bands within the project's legal authorization.

02

One sensor node coordinating multiple response nodes

One sensing node can coordinate multiple response nodes for wider coverage and staged deployment.

03

Portable field operation

A compact field format supports patrol teams, temporary security and incident-led deployment.

04

Rapid setup for temporary or incident-led protection

Modular setup and straightforward controls shorten the path from arrival to an operating system.

05

Event, operator and action audit trail

Records events, operator actions and supporting data for review, reporting and acceptance workflows.

Product specifications

Labels are translated for readability. Figures, units, ranges and option markers follow the source catalog without combining entries.

Source catalog pages 39-40
Countermeasure bands
900MHz, 1.2GHz, 1.6GHz, 2.4GHz, 5.2GHz, 5.8GHz
Countermeasure distance
≥2km (subject to operating conditions and aircraft model)
Display size
7 inches
Operating endurance
≥6h
Operating temperature
(-40℃~+60℃)±2℃
Battery
Built-in low-temperature lithium batteries, two supplied as standard
Weight
≤8kg (battery included)
Dimensions
390mm*160mm*326mm (L*W*H)

Responsible deployment

Detection, positioning and controlled-response configurations are provided for lawful, authorized use. Spectrum, aviation, privacy, import and operating approvals remain project-specific.

Start with the operating problem.

Share the site, required outcome and regulatory boundary. We will structure the right technical discussion.

Discuss a project