D3 handheld controlled-response system

D3

D3 handheld controlled-response system

A field-portable tool for authorized short-duration response during patrol, temporary protection and incident handling, with long-endurance battery support.

Discuss this system

Product introduction

A field-portable tool for authorized short-duration response during patrol, temporary protection and incident handling, with long-endurance battery support.

Core capabilities

A field-portable tool for authorized short-duration response during patrol, temporary protection and incident handling, with long-endurance battery support.

01

Authorized, operator-controlled spectrum response

Supports operator-controlled action across the configured bands within the project's legal authorization.

02

Portable field operation

A compact field format supports patrol teams, temporary security and incident-led deployment.

03

Rapid setup for temporary or incident-led protection

Modular setup and straightforward controls shorten the path from arrival to an operating system.

04

One sensor node coordinating multiple response nodes

One sensing node can coordinate multiple response nodes for wider coverage and staged deployment.

Product specifications

Labels are translated for readability. Figures, units, ranges and option markers follow the source catalog without combining entries.

Source catalog pages 23-24
Countermeasure bands
800/900MHz, 1.2GHz, 1.4GHz, 1.5GHz, 2.4GHz, 5.8GHz (6 bands)
Countermeasure bands
400MHz, 900MHz, 1.2GHz, 1.4GHz, 1.5GHz, 2.4GHz, 5.2GHz, 5.8GHz (8 bands)
Countermeasure distance
≥2km (subject to operating conditions and aircraft model)
Operating duration
≥24h
Operating temperature
(-40℃~+60℃)±2℃
Battery
Built-in low-temperature lithium batteries, two supplied as standard
Weight
≤7kg (battery included)
Dimensions
776mm*105mm*304mm (L*W*H)

Responsible deployment

Detection, positioning and controlled-response configurations are provided for lawful, authorized use. Spectrum, aviation, privacy, import and operating approvals remain project-specific.

Start with the operating problem.

Share the site, required outcome and regulatory boundary. We will structure the right technical discussion.

Discuss a project