D2-S1 navigation-signal protection system

D2-S1

D2-S1 navigation-signal protection system

A configurable fixed-site layer for establishing an authorized navigation-signal protection zone, operating independently or in coordination with detection and radar nodes.

Discuss this system

Product introduction

A configurable fixed-site layer for establishing an authorized navigation-signal protection zone, operating independently or in coordination with detection and radar nodes.

Core capabilities

A configurable fixed-site layer for establishing an authorized navigation-signal protection zone, operating independently or in coordination with detection and radar nodes.

01

Configurable navigation-signal protection zone

Adds a configurable navigation-signal layer for authorized area protection and coordinated operation.

02

One sensor node coordinating multiple response nodes

One sensing node can coordinate multiple response nodes for wider coverage and staged deployment.

03

Weather-resistant fixed-site operation

Designed for permanent or semi-permanent sites with continuous monitoring and platform integration.

04

Event, operator and action audit trail

Records events, operator actions and supporting data for review, reporting and acceptance workflows.

Product specifications

Labels are translated for readability. Figures, units, ranges and option markers follow the source catalog without combining entries.

Source catalog pages 17-18
Supported bands
GPS L1, GPS L2, GPS L5, GLONASS L1, BDS B1I, GALILEO E1
Activation time
<10s
Aircraft capacity
≥10 aircraft
Frequency tolerance
<±2x10-6
Protection radius
1km
Input power
AC220V/50Hz
Operating temperature
(-40℃~+60℃)±2℃
Ingress protection
IP66
Weight
≤11kg
Dimensions
351mm*150mm*355mm (L*W*H)

Responsible deployment

Detection, positioning and controlled-response configurations are provided for lawful, authorized use. Spectrum, aviation, privacy, import and operating approvals remain project-specific.

Start with the operating problem.

Share the site, required outcome and regulatory boundary. We will structure the right technical discussion.

Discuss a project